Completion of the Project

The completed structure with a few extra people thrown in for good measure.

Slap Happy.

Finishing the last odds and ends.

Carrying extra cement for storage.

Heading home in the fog.  We wore machetes at night for protection as did all of the community.  Occasionally outsiders would come from lower towns to try and stir up trouble.  The machetes helped prevent that.

One last visit to the school before we left.

Tank Progress

Burning the ends of a PVC pipe.

The walk down to town.

Branches in the road mean roadwork in that lane.

Back up on the job site still mixing concrete.

A nicely made security door.

The electricity meter on the school.

A dog came to help.

Hanging the gutter.

Tall guys helped hold it up.

All installed.

Birdie became a favorite with the kids.

The tank in place.